Plymouth War Memorial

Project: Plymouth War Memorial
Client: Plymouth City Council
Main contractor: SWCR Ltd
Work involved: Specialist Cleaning & Remedial Works
Date: April 2008

The Brief

The requirements of the contract were to clean the masonry surfaces and re-point loose and missing mortar joints. In order to remove the carbon deposits a specialist cleaning agent was required which as well as being aggressive enough to remove the carbon but not damage the masonry surfaces. The product also had to be environmentally friendly.

The Solution

South West Concrete Repairs Ltd recommended a suitable product which was brush applied, scrubbed into the surface and then removed using a high pressure power washer. Up to five separate applications were required on the worst affected areas.

Loose mortar joints were removed and replaced using a sand / cement / lime mix mortar designed to match colour and texture of the original mortar joints.

East Street, Newquay

Concrete Repairs & Coatings

Reception Tank, South Petherton

Concrete Repairs

Somerset Fire Stations

Concrete Repairs

Plymouth Argyle, Plymouth

Concrete Repairs