Derry’s Clock Tower

Project: Derry’s Clock Tower
Client: Plymouth City Council
Main contractor: SWCR Ltd
Work involved: Cleaning & Remedial Works
Date: April 2008

The Brief

The requirements of the contract were to clean the masonry surfaces and re-point loose and missing mortar joints. In order to remove the carbon deposits a specialist cleaning agent was required which as well as being aggressive enough to remove the carbon but not damage the masonry surfaces. The product also had to be environmentally friendly.

The Solution

South West Concrete Repairs Ltd recommended a suitable product which was brush applied, scrubbed into the surface and then removed using a high pressure power washer. Up to five separate applications were required on the worst affected areas.

Loose mortar joints were removed and replaced using a sand / cement / lime mix mortar designed to match colour and texture of the original mortar joints.

A380 Ware Barton & Telegraph Hill (Southbound)

Concrete Repairs and Cathodic Protection

Hurst Castle

Concrete Repairs works to Grade 1 & 2 Listed building.

Bretonside Viaduct, Plymouth

Ford Road, Brays Close, Tiverton & Westexe South, Crediton

Concrete Repairs and Non Slip Coatings to Balconys, Stairways and Walkways.