Exeter EfW

Project: Exeter EfW
Main contractor: Chilworth Construction Management
Work involved: Grouting to Steel Stanchions and Plant Basesy, Resin Injection and Concrete Repairs
Date: December 2013 & May 2014

The Brief

Exeter EfW is an Energy from Waste (EfW) plant. The Combined Heat and Power (CHP) facility will use energy stored in non– recyclable waste to produce heat and electricity. THE Steel Stanchions and plant bases at this facility had voids around and underneath them which had to be filled. There were a variety of sizes and shapes which required filling with something that would be strong and non – shrinking..

The Solution

Routine maintenance inspections had identified numerous defects to the bridge structure, these included concrete spalling and cracking to the pier caps as well as corrosion to some of the steel elements. This required strengthening to the bearings and some works to the fish plates.

East Street, Newquay

Concrete Repairs & Coatings

Reception Tank, South Petherton

Concrete Repairs

Somerset Fire Stations

Concrete Repairs

Plymouth Argyle, Plymouth

Concrete Repairs