Environmental Agency Bridges

Project: EA Bridges
Client: The Environment Agency
Main contractor: Dawnus Construction
Work involved: Various Repairs to Bridges
Date: April 2012

The Brief

During one of the Environment Agency’s regular inspections, a number of small bridges were found to have various defects ranging from simple re-pointing works to full concrete repairs. A total of 37 bridges between Exeter and Bristol were selected to have individual assessment and appropriate repairs carried out.

The Solution

Dawnus Construction were drafted in by the Environment Agency to carry out the assessments and to decide the necessary works on each of the 37 bridges.

South West Concrete Repairs Ltd were contracted to carry out the repair works which included; re-pointing, crack stitching, joint renewal, resin injection, concrete repairs, re-building of some of the missing stonework and various other works as deemed necessary.

A380 Ware Barton & Telegraph Hill (Southbound)

Concrete Repairs and Cathodic Protection

Hurst Castle

Concrete Repairs works to Grade 1 & 2 Listed building.

Bretonside Viaduct, Plymouth

Ford Road, Brays Close, Tiverton & Westexe South, Crediton

Concrete Repairs and Non Slip Coatings to Balconys, Stairways and Walkways.